Case Overview
This case covers a mold base and injection mold builder in Poland supplying automotive and appliance tooling. The shop replaced commercial 6061 plate with stress relieved 6061 T651 tooling plate, flat, UT tested and documented to EN 10204 3.1.
| Item | Detail |
|---|---|
| Customer | Mold base and injection mold builder in Poland, automotive and appliance tooling |
| Application | Mold base plates, cavity blocks, bolster plates, fixture bases |
| Product | 6061 T651 stress relieved tooling plate, 6 to 200 mm, cut to size |
The Challenge
- Plate arrived out of flat. Commercial 6061 sheet carried bow and twist, so the shop faced off 3 to 5 mm per side to reach parallelism, turning purchased material into chips.
- Porosity found after polishing. Without an ultrasonic report, internal porosity surfaced at final polishing, scrapping a cavity block after days of milling.
- Documentation gaps. Automotive customers required EN 10204 3.1 certificates traceable to a heat number; stockist paperwork stopped at a generic mill certificate.
- Long mill lead times. European mill deliveries ran 6 to 8 weeks, pushing mold trials past PPAP dates.
The Solution: Stress Relieved 6061 T651, Flat and Documented
Plates are thermally stress relieved so flatness holds after the base is cut and milled, supplied saw cut with deburred edges or machined to plus or minus 0.05 mm against a drawing.
| Grade | Size | Supply form | Where used |
|---|---|---|---|
| 6061 T651 tooling plate | 6 to 200 mm, up to 6000 mm | Stress relieved, flatness 3 mm per meter, UT tested | Mold base and bolster plates |
| 6061 T651 machined | 10 to 150 mm | CNC milled, drilled, tapped, burr free, plus or minus 0.05 mm | Cavity blocks, fixture bases |
Specification Highlights
| Property | Value |
|---|---|
| Alloy and temper | 6061 T651 / T6, EN AW 6061 equivalent |
| Mechanical | Yield 276 MPa min, tensile 310 to 340 MPa, elongation 10% min, 95 HB |
| Flatness | 3 mm per meter after stress relief, 2 mm per meter on machined plate |
| Internal quality | Ultrasonic inspection, no porosity or inclusions accepted |
| Documents | EN 10204 3.1 MTC with heat number, UT and dimensional reports, RoHS |
Results After Two Supply Cycles
| Metric | Before | After | Change |
|---|---|---|---|
| Allowance per face | 3 to 5 mm | 1 to 1.5 mm | 60% less material |
| Facing hours per base | Baseline | Down 45% | Faster release |
| Scrap from hidden porosity | Occasional block loss | Zero | UT before machining |
| Lead time | 6 to 8 weeks | 18 to 30 days | About half |
Why the Customer Chose Our Factory
Four suppliers were shortlisted: two European stockists, one trader and our mill. The decision turned on five points, none of them price alone.
- Sample plate proven on their own machine. Two 6061 T651 samples with UT reports arrived in nine days; the shop milled them, measured flatness and approved the material before issuing a purchase order.
- Documents offered before the order, not after. EN 10204 3.1 with heat number, UT and dimensional reports and RoHS were written into the offer, so the buyer could show the file to its automotive customer in advance.
- Numbers written into the quotation. Flatness, tolerance and stock lead time were quoted as commitments, letting the buyer compare offers line by line.
- Factory, not trader. Rolling, stress relief and cutting happen in one plant with 3000 tons monthly capacity and an in-house laboratory, so a re-cut or a repeat order does not wait for a third party.
- Inspection and payment flexibility. SGS, BV or TUV inspection before shipment was accepted, and T/T, L/C, D/P and O/A terms let the buyer keep its own cash flow plan.
Tooling Manager, mold base builder in Poland
Talk to Us About Your Mold Base
We supply 6061 T651 and 6082 T6 stress relieved tooling plate, 6 to 200 mm, cut to size or machined to drawing, with UT reports and EN 10204 3.1 documents, shipped EU-wide.

